Watch the Construction of the new Cooper River Bridge

 

 
Frank's Home Page

 

 

Archives


The Bridge Blog
A dialog about our new bridge and these web pages

Overview. As a pointy-headed university professor, my weekend project of bridge photography and building these web pages generated many questions and introduced me to just-in-time learning. I enjoy chasing my curiosity and want to identify ways to encourage younger learners to also enjoy curiosity chasing and learning.

Learning usually requires repetition while forgetting occurs when I infrequently use information. Many young learners do not understand the importance of repetition. Weekly visits to the bridge provided the repetition necessary to detect changes in the bridge and consequently generated many questions and opportunities for learning. Over the course of the bridge project, I had access to few experts for answering questions. Rather than a liability, this became an asset and pushed me to improve my search skills with Google. Soon, I found that answers to questions encountered during my weekly photo shoots were often only a Google-search away - (see Restoring the Joy in Learning). Consequently Google + Internet became dependable extensions of my memory.

The bridge story is a work in progress and is evolving from a simple collections of photographs to an experiment with Internet-centric just-in-time learning. Insights I gain from you will find their way into the learning centers of MUSC. Palmetto Bridge Constructors, a joint venture between Tidewater Skanska and Flatiron Constructors, as well as High Steel Structures, Freyssinet, the SCDOT and the Federal Highway Commission Office of Bridge Technology guided much of my learning. I also learn from many of you and from Google-linked resources. More important is the e-mail encouragement I receive from many of you.

Thu, 09 Jun 2005

June 9 2005: Opening Dates Announced

Patiently waiting is not one of my virtues but I have learned that waiting impatiently takes just as long. Here is the best information I have, following an announcement from SCDOT today (June 9, 2005):
July 9 Saturday afternoon Bridge Open for pedestrian strolling
July 10 Sunday afternoon Bridge Open for pedestrian strolling
July 11 Monday evening Fundraising event
July 14 Thursday evening Fireworks then stay-cable lighting
July 16 Saturday 9am Bridge Dedication and formal opening
Other event times are a bit uncertain, but I shall post them as soon as I find out


posted at: 10:00 | path: | permanent link to this entry

Write me:
frank.starmer at gmail.com

April 2006
Sun Mon Tue Wed Thu Fri Sat
           
15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30            
2005
2004
2003
- View all entries
- Blog RSS
-
Photo RSS

- Frank's Internet home

- Overview of Building the Ravenel Bridge

Bridge Links

- Powered by Blosxom